Demolition of industrial buildings
Between August and October 2003, INTER-BUD carried out the demolition of structures that had formerly served as production and technical buildings on the site of the “Chemitex-Anilana” Chemical Fibre Works (ZWCh). A total of 6,800 m² of former production buildings was demolished and turned into 8,900 m³ of rubble, which was then sorted and crushed, while waste unsuitable for the future construction process was disposed of.
- Category
- Industrial
- Years
- 2003
- Status
- Completed
- Location
- Łódź, Al. Piłsudskiego